Strawberry Property Owners Association
Del Oro Proposed System Upgrades
The Del Oro Water Company has identified the following list of system
Maintenance and Upgrades to the current water system as of September 22, 2006.
These initial improvements were highlighted at the September 30 public meeting
conducted by the California Public Utilities Commission at the Pinecrest
Elementary School. DOWC is in the process of performing an engineering analysis
of the entire water infrastructure to determine what elements need to be
upgraded immediately versus those that can be replaced over a longer period
of time.
Return to the SPOA home page